by Marketing | Feb 4, 2022 | Configuration Advanced IPm-Group, Software Load 113 135 - Group
GRIDlink Recovery 113-135 Series This procedure is for units in the field needing recovery due to long term inactivity. Loading Software If the device is Offline with GRIDview, the sxclient must be installed locally using the Toolkit configurator. Procedure 1...
by Marketing | Dec 7, 2021 | DynamicADR-Group
Principle of Operation This document details the Operational Logic and the Definitions of Elements pertaining to the strategy for control logic executed in an OpenADR End Node that changes via Special 2.0b Signals and surrogates. Dynamic ADR Control Set Point...
by Marketing | Dec 4, 2021 | DynamicADR-Group
Dynamic ADR Control logic executed in an OpenADR End Node that changes via Special 2.0b Signals and surrogates. Edge Computing & Control that permits high granularity facility configuration to protect equipment, lower impact and maximize efficiencies. Dynamic...
by Marketing | Nov 12, 2021 | Trouble Shooting E-CE Series, Trouble Shooting E2-Group
Trouble Shooting – E Series Trouble Shooting Problem: The E2 Series was powered but was without an Internet connection for a long period of time, once reconnected the Tags fail to update. The status report updates once but fails further updates. Solution: This...
by Marketing | Nov 11, 2021 | Customer Support-Group
Installation & Configuration Installation & Configuration Configuration (Initial) for 113/135 Series Assign Resources – ToolkitConfigure RS485 Serial Port for Modbus RTUEthernet Connection – ToolkitSet Ethernet Port to DHCP – ToolkitShow...